| CPC E21B 44/00 (2013.01) [E21B 47/00 (2013.01); G05B 15/02 (2013.01); H04L 67/125 (2013.01); G06Q 10/06313 (2013.01)] | 20 Claims |

|
1. A method comprising:
receiving information and analyzing the information with respect to tiered well construction activities;
determining at least one constraint associated with the tiered well construction activities based on the information;
generating a workflow, based on the at least one constraint, to be performed by field equipment, wherein the workflow includes at least a series of tiered well construction activities;
generating a digital well plan for the workflow;
executing the digital well plan by a control system to control the field equipment; and
monitoring performance of at least one of the series of tiered well construction activities using one or more sensors to ensure that the at least one constraint is adhered to by control of the field equipment, wherein the at least one constraint includes a dynamic constraint that arises in response to the monitoring of the performance of the at least one of the series of tiered well construction activities, wherein the dynamic constraint is based on at least one change in circumstances.
|