CPC E21B 43/00 (2013.01) [E21B 2200/20 (2020.05)] | 32 Claims |
1. A method of operating a computer system for modelling one hydrocarbon production well of a first plurality of hydrocarbon production wells, the method comprising:
receiving, for each hydrocarbon production well of the first plurality of hydrocarbon production wells, respective data relating to flow parameters of the respective hydrocarbon production well, and/or well parameters of the respective hydrocarbon production well, and/or an associated status of at least one control point in a flow path associated with the respective hydrocarbon production well, wherein the wells of the first plurality of wells are not all connected to a same hydrocarbon reservoir; and
generating, using data-driven modelling, a first data-driven well model that models, for any individual hydrocarbon production well of the first plurality of hydrocarbon production wells: flow parameters of the hydrocarbon production well, and/or well parameters of the hydrocarbon production well, and/or an associated status of at least one control point in a flow path associated with the hydrocarbon production well,
wherein the first data-driven well model is parameterised by a set of first model parameters representative of properties common to all of the first plurality of hydrocarbon production wells, and
wherein generating the first data-driven well model comprises processing the received data in the computer system using data-driven modelling to determine, for each of the first model parameters, a respective value of the first model parameter in dependence upon data received for all of the first plurality of hydrocarbon production wells.
|