CPC C10L 3/08 (2013.01) [B01D 53/526 (2013.01); B01D 53/62 (2013.01); C01B 3/34 (2013.01); C01B 3/48 (2013.01); C10L 1/02 (2013.01); C10L 1/04 (2013.01); C10L 3/104 (2013.01); C12P 5/023 (2013.01); F17C 5/00 (2013.01); F17C 7/00 (2013.01); F23D 14/28 (2013.01); B01D 2257/304 (2013.01); B01D 2257/504 (2013.01); B01D 2257/80 (2013.01); B01D 2258/05 (2013.01); C01B 2203/0238 (2013.01); C01B 2203/0283 (2013.01); C01B 2203/062 (2013.01); C01B 2203/1241 (2013.01); C01B 2203/1258 (2013.01); C10L 2200/0469 (2013.01); C10L 2200/0492 (2013.01); C10L 2270/10 (2013.01); C10L 2290/26 (2013.01); C10L 2290/42 (2013.01); C10L 2290/544 (2013.01); F17C 2270/01 (2013.01)] | 21 Claims |
1. A method for producing fuel from biogas comprising:
(a) providing biogas from a plurality of biogas sources, the biogas from each biogas source produced in a process comprising:
(i) collecting raw biogas from one of the biogas sources in the plurality, the raw biogas comprising methane and carbon dioxide;
(ii) optionally, subjecting the raw biogas to a partial purification to produce partially purified biogas, wherein the partial purification removes less than 75% of the carbon dioxide from the raw biogas;
(iii) filling a vessel with the raw biogas or the partially purified biogas to a pressure of at least 1500 psig;
(iv) transporting the filled vessel to a centralized processing facility by vehicle; and
(v) removing the raw biogas or the partially purified biogas from the vessel transported to the centralized processing facility;
(b) producing fuel in a fuel production process, the fuel production processing comprising feeding the biogas provided in step (a) to a biogas upgrading system, the biogas upgrading system configured to provide a compressed stream of carbon dioxide removed from the biogas; and
(c) providing carbon dioxide from the compressed stream of carbon dioxide for transport by vehicle, pipeline, or a combination thereof.
|