| CPC B61L 27/04 (2013.01) [G05B 13/027 (2013.01)] | 20 Claims |

|
1. A method for controlling a train, comprising:
acquiring a current control level of the train and outputting the current control level to a train traction control system;
acquiring current train operation data and calculating an evaluation score according to the current train operation data by the train traction control system; and
inputting the current train operation data and the evaluation score into a neural network learning system to adjust the current control level of the train to obtain a final outputted control level.
|