CPC F16L 55/24 (2013.01) [B01D 17/02 (2013.01); B01D 17/12 (2013.01); B08B 9/055 (2013.01); C02F 1/008 (2013.01); C02F 1/40 (2013.01); E21B 43/34 (2013.01); F16L 55/26 (2013.01); F17D 3/14 (2013.01); F17D 3/16 (2013.01); B08B 2209/055 (2013.01); C02F 2101/32 (2013.01); C02F 2303/22 (2013.01); F16L 2101/12 (2013.01)] | 21 Claims |
1. A method of operating a pipeline, the method comprising:
determining, based on observed operational parameters of equipment of an upstream process facility, an indirect quality parameter for processed production fluid output from the upstream process facility and routed into a pipeline downstream of the upstream process facility;
determining, based on measurements of characteristics of the processed production fluid output from the upstream process facility, a direct quality parameter for the processed production fluid;
determining a quality parameter for the processed production fluid that is defined as the greater of the indirect quality parameter and the direct quality parameter for the processed production fluid;
determining, based on the quality parameter for the processed production fluid, a model of the pipeline that comprises a cumulative water accumulation of a segment of the pipeline;
determining, based on the cumulative water accumulation of the segment of the pipeline, a water remediation schedule for the segment of the pipeline; and
conducting, in accordance with the water remediation schedule for the segment of the pipeline, a water remediation operation in the segment of the pipeline.
|