US 12,235,628 B2
Resource management for modular plants
Marcel Dix, Mannheim (DE); Katharina Stark, Weinheim (DE); Roland Braun, Niederkassel Luelsdorf (DE); Michael Vach, Wilhelmsfeld (DE); Sten Gruener, Laudenbach (DE); Mario Hoernicke, Landau (DE); and Nicolai Schoch, Heidelberg (DE)
Assigned to ABB Schweiz AG, Baden (CH)
Filed by ABB Schweiz AG, Baden (CH)
Filed on Nov. 26, 2021, as Appl. No. 17/535,724.
Claims priority of application No. 20210060 (EP), filed on Nov. 26, 2020.
Prior Publication US 2022/0163949 A1, May 26, 2022
Int. Cl. G05B 19/418 (2006.01)
CPC G05B 19/41845 (2013.01) [G05B 19/4183 (2013.01); G05B 19/41885 (2013.01)] 14 Claims
OG exemplary drawing
 
1. A computer-implemented resource management method for modular plants, the method comprising:
receiving data identifying a required module type to be assembled into the modular plant as part of a module pipeline comprising one or more modules, the one or more modules being wrapped by a semantic description and collected usage data, the data including a precondition and a postcondition for the module pipeline;
executing an optimization algorithm to select, from a plurality of modules having the required module type and based on the data, a module for inclusion in the module pipeline on a basis of one or more predetermined optimization criteria and module attributes of the module; and
determining a sequence of modules included in the module pipeline to match the precondition and the postcondition of the module pipeline based on input attributes and output attributes of each module of the one or more modules.