CPC E21B 43/12 (2013.01) [E21B 43/14 (2013.01); E21B 34/063 (2013.01); E21B 34/142 (2020.05)] | 13 Claims |
1. A well completion assembly comprising:
a plurality of inflow control devices (ICDs), each ICD configured to be installed at a respective fluid producing zone of a subterranean zone and to control flow of well fluids from the respective fluid producing zone into a wellbore formed in the subterranean zone;
a plurality of compartments corresponding to the plurality of ICDs, each ICD configured to be installed within a respective compartment, the plurality of compartments serially connected to each other and arranged sequentially from an uphole location to a downhole location, the plurality of compartments defining successively smaller diameters from the uphole location to the downhole location; and
a plurality of plugs corresponding to the plurality of compartments, each plug configured to be received in a respective compartment to close flow of well fluids from the subterranean zone into the wellbore through a respective ICD installed in the respective compartment, wherein the plurality of plugs is directly connected to each other and suspended uphole of the plurality of compartments.
|