US 12,234,692 B2
Automated apparatus for oil field drilling and workover operations
Xiqing Zhang, Shandong (CN); Duanguang Zhang, Shandong (CN); Junfang Shen, Shandong (CN); Jidi Yu, Shandong (CN); Qiuling Wang, Shandong (CN); Ye Ji, Shandong (CN); Yang Li, Shandong (CN); Xiaoyu Cui, Shandong (CN); Zhongwei Li, Shandong (CN); Chunli Guan, Shandong (CN); and Xiaonan Zhang, Shandong (CN)
Assigned to SHENGLI OILFIELD SHENGJI PETROLEUM EQUIPMENT CO., LTD., Shandong (CN)
Filed by SHENGLI OILFIELD SHENGJI PETROLEUM EQUIPMENT CO., LTD., Shandong (CN)
Filed on Jun. 15, 2023, as Appl. No. 18/335,992.
Application 18/335,992 is a continuation in part of application No. PCT/CN2021/141749, filed on Dec. 27, 2021.
Claims priority of application No. 202023246053.1 (CN), filed on Dec. 28, 2020; application No. 202120001448.0 (CN), filed on Jan. 4, 2021; application No. 202120001464.X (CN), filed on Jan. 4, 2021; application No. 202120001472.4 (CN), filed on Jan. 4, 2021; and application No. 202110503197.0 (CN), filed on May 10, 2021.
Prior Publication US 2024/0018833 A1, Jan. 18, 2024
Int. Cl. E21B 19/087 (2006.01); E21B 15/00 (2006.01); E21B 19/06 (2006.01); E21B 19/10 (2006.01); E21B 19/24 (2006.01)
CPC E21B 19/087 (2013.01) [E21B 15/00 (2013.01); E21B 19/06 (2013.01); E21B 19/10 (2013.01); E21B 19/24 (2013.01)] 20 Claims
OG exemplary drawing
 
1. An automated equipment for drilling and workover operations of oil field, the automated equipment comprising:
a workover rig, a derrick floor, an elevator, a monkey-board string automatic placement apparatus, a slip, an oil field workover operation device, a power clamp, and a derrick floor pipe handling manipulator,
wherein the workover rig, the derrick floor, the elevator, the monkey-board string automatic placement apparatus, the slip, the oil field workover operation device, the power clamp, and the derrick floor pipe handling manipulator cooperate with each other to realize a lifting operation and a lowering operation of a string at a wellhead, and
wherein the workover rig has a derrick, the workover rig is arranged along a front-rear direction of the automated equipment, and the derrick is disposed at a rear end portion of the workover rig and aligned with the wellhead;
the derrick floor is placed on a ground and disposed at the wellhead, and the derrick floor is disposed adjacent to the derrick; and
the oil field workover operation device is positioned on one side of the wellhead in a left-right direction of the automated equipment, and the oil field workover operation device is disposed on the derrick floor in a manner of being movable between a raised position where the oil field workover operation device extends out above the derrick floor and a retreated position where the oil field workover operation device retreats below the derrick floor.