US 11,910,220 B2
Method and device for measuring interference or signal received power
Zhihua Shi, Guangdong (CN); Wenhong Chen, Guangdong (CN); and Zhi Zhang, Guangdong (CN)
Assigned to GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD., Guangdong (CN)
Filed by GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD., Guangdong (CN)
Filed on Aug. 4, 2022, as Appl. No. 17/817,646.
Application 17/817,646 is a continuation of application No. 17/386,382, filed on Jul. 27, 2021, granted, now 11,438,785.
Application 17/386,382 is a continuation of application No. PCT/CN2019/074713, filed on Feb. 3, 2019.
Prior Publication US 2022/0377592 A1, Nov. 24, 2022
Int. Cl. H04W 24/10 (2009.01); H04B 17/336 (2015.01); H04L 5/00 (2006.01); H04L 25/02 (2006.01); H04B 17/327 (2015.01); H04L 43/50 (2022.01); H04W 24/06 (2009.01)
CPC H04W 24/10 (2013.01) [H04B 17/327 (2015.01); H04B 17/336 (2015.01); H04L 5/0051 (2013.01); H04L 5/0073 (2013.01); H04L 25/0226 (2013.01); H04L 43/50 (2013.01); H04W 24/06 (2013.01); Y02D 30/70 (2020.08)] 14 Claims
OG exemplary drawing
 
1. A method for interference or signal received power measurement, comprising:
receiving, by a network device, a to-be-reported value sent by a terminal device;
determining, by the network device, a reference signal received power (RSRP) value corresponding to at least one sounding reference signal (SRS) resource based on the to-be-reported value, wherein at least one RSRP value is obtained based on measurement on an interference or signal received power for the SRS resource; wherein the interference or signal received power measurement comprises cross-link interference (CLI) measurement; and
communicating, by the network device, with the terminal device based on the at least one RSRP value; wherein determining, by the network device, the reference signal received power (RSRP) value corresponding to the at least one sounding reference signal (SRS) resource based on the to-be-reported value comprises:
determining, by the network device, the RSRP value corresponding to the at least one SRS resource based on the to-be-reported value and a mapping relationship between a measurement interval of at least one RSRP value and a to-be-reported value; wherein at least one measurement interval comprises a plurality of measurement intervals, and a difference between a maximum value and a minimum value of each of other measurement intervals except a measurement interval to which a minimum RSRP value belongs and a measurement interval to which a maximum RSRP value belongs, in the plurality of measurement intervals, is the same.