| CPC H02P 23/14 (2013.01) [F25B 49/025 (2013.01)] | 21 Claims |

|
1. A method of operating a heating, ventilation, and/or air conditioning (HVAC) system, comprising:
transmitting, using an equipment control board, an operation request in a pulse width modulation (PWM) signal to an electronically commutate motor (ECM) controller of a blower motor, wherein the operation request comprises a switching period command configured to vary a switching period of the PWM signal;
operating the blower motor in accordance with the operation request by varying the switching period of the PWM signal;
detecting a parameter of the blower motor for each of a plurality of switching periods as the switching period varies; and
mapping the parameter of the blower motor for each of the plurality of switching periods;
the method further comprising:
transmitting, using the equipment control board, a second operation request in a second PWM signal to the ECM controller of the blower motor, wherein the second operation request comprises a second switching period command configured to hold a second switching period of the second PWM signal fixed; and
operating the blower motor in accordance with the second operation request by varying the duty cycle of the second PWM signal and holding the second switching period fixed;
detecting a second parameter of the blower motor for each second operation request; and
mapping the second parameter of the blower motor for each of the second operation requests.
|