| CPC G02B 6/48 (2013.01) [B25J 9/1666 (2013.01); G06T 7/521 (2017.01); G06T 7/593 (2017.01); G06T 7/70 (2017.01); G06V 20/10 (2022.01); H02G 1/04 (2013.01); H02G 7/02 (2013.01); H04N 13/239 (2018.05); G06T 2207/10048 (2013.01); H04N 2013/0081 (2013.01)] | 12 Claims |

|
1. A system for suspending cable from an overhead powerline, the system comprising:
a payload subsystem for housing and dispensing a cable along an overhead powerline;
a rotation subsystem for winding the cable from the payload subsystem around the powerline;
an extension subsystem for moving the payload subsystem to avoid obstacles;
an obstacle detection subsystem for automatically detecting obstacles encountered along the powerline to be avoided with the extension subsystem;
a drive subsystem for driving the system along the powerline; and
at least one processor for controlling the payload subsystem, rotation subsystem, extension subsystem, obstacle detection subsystem, and drive subsystem in a manner that avoids obstacles as the system moves along the powerline.
|