| CPC G01B 7/18 (2013.01) [E01F 9/30 (2016.02); G01L 1/205 (2013.01); G01L 1/22 (2013.01); G01N 3/18 (2013.01); G01N 3/60 (2013.01); B61L 23/048 (2013.01); B61L 27/53 (2022.01)] | 17 Claims |

|
1. A system for rail track infrastructure monitoring, comprising:
rail track infrastructure;
a sensor enabled geogrid, comprising:
a multiaxial geogrid;
two or more sensors, comprising at least a strain gauge and an accelerometer, operatively configured to the multiaxial geogrid;
a microcontroller housed in a protective sensor pod, wherein the microcontroller receives signals from the sensor enabled geogrid;
a communication network, wherein the communication network transmits the received signals from the microcontroller to a computer network; and
the computer network operatively configured to display information from the one or more sensors about the health, condition, and/or status of the rail track infrastructure based upon at least a base strain gauge measurement parameter, an accelerometer measurement parameter, and a max strain amount parameter, wherein the accelerometer measurement parameter is used to filter out erroneous strain.
|