| CPC E21B 49/00 (2013.01) [E21B 47/00 (2013.01); G01V 5/102 (2013.01); G06N 3/045 (2023.01)] | 20 Claims |

|
1. A method for determining a borehole holdup, the method comprising:
logging a well with a pulsed-neutron logging (PNL) tool;
receiving, via the PNL tool, transient decay measurements, capture spectrum measurements, and inelastic spectrum measurements;
extracting information from each of the capture spectrum measurements, the inelastic spectrum measurements, and the transient decay measurements;
combining at least some of the extracted information to form an input;
inputting the input into a model; and
determining the borehole holdup with the model.
|