CPC F01C 20/28 (2013.01) [F01D 17/06 (2013.01); F01D 17/145 (2013.01); F01D 17/26 (2013.01); F01D 21/02 (2013.01); F01K 13/003 (2013.01); F01K 13/02 (2013.01); F02C 7/232 (2013.01); F02C 9/263 (2013.01); F02C 9/28 (2013.01); F02C 9/52 (2013.01); F02C 9/54 (2013.01); F16K 37/0041 (2013.01); F16K 37/0083 (2013.01); G01P 21/02 (2013.01); G01R 31/2829 (2013.01); H02J 3/381 (2013.01); H02J 3/40 (2013.01); F05D 2220/31 (2013.01); F05D 2260/80 (2013.01); F05D 2270/02 (2013.01); F05D 2270/021 (2013.01); F05D 2270/80 (2013.01)] | 20 Claims |
1. A turbine control system, comprising:
a speed probe detecting a speed of a turbine;
a turbine valve controlling a flow of a fluid or a gas to or from the turbine;
a controller in communication with the speed probe and the turbine valve, the controller receiving a speed signal from the speed probe, and the controller sending a first signal and a second signal to the turbine valve, the first signal comprising a valve position command to change a position of the turbine valve in response to the speed signal and the second signal comprising a support function that does not command a change in position of the turbine valve in response to the speed signal,
wherein the controller outputs the first signal at a faster rate than the second signal.
|