CPC E21B 49/005 (2013.01) [E21B 45/00 (2013.01); E21B 49/003 (2013.01); E21B 2200/20 (2020.05); E21B 2200/22 (2020.05)] | 14 Claims |
1. A method for formation pore pressure prediction, the method comprising:
obtaining an input parameter set while drilling a well, the input parameter set comprising:
surface drilling parameters,
logging while drilling parameters, and
advanced mud gas measurements;
obtaining a historical data set from an offset well, the historical data set comprising:
a historical input parameter set, and
historical pore pressure;
identifying at least one input parameter of the input parameter set that is considered non-relevant for predicting the pore pressure by determining that the at least one input parameter that is considered non-relevant has a mean squared error greater than a threshold selected for the historical pore pressure;
generating, from the input parameter set, a reduced input parameter set, by eliminating the at least one input parameter of the input parameter set that is considered non-relevant;
predicting the pore pressure by applying a machine learning model to the reduced input parameter set; and
guiding the drilling of the well using the predicted pore pressure;
wherein determining the at least one input parameter of the input parameter set that is considered non-relevant for predicting the pore pressure comprises at least one of:
a linear correlation filter,
a neighborhood components analysis, and
a forward selection and backward elimination.
|