CPC E21B 47/047 (2020.05) [E21B 33/06 (2013.01); E21B 33/127 (2013.01); E21B 47/06 (2013.01)] | 19 Claims |
1. A method, comprising:
creating a chamber within an annulus between a wellbore casing and a drillpipe, wherein an upper boundary of the chamber comprises a seal and a lower boundary of the chamber comprises a liquid surface;
determining a volume of the chamber at a first time, wherein determining the volume of the chamber comprises:
measuring, using a pressure gauge, a first pressure within the chamber,
changing an amount of a gas in the chamber using a gas pump,
measuring, using the pressure gauge, a second pressure within the chamber,
determining a first volume of gas within the chamber based on the first and second pressure measurements and the change in the amount of gas, and
determining a first fluid level based on the first volume of the chamber.
|