| CPC H02J 13/00034 (2020.01) [G01R 19/2513 (2013.01); G06Q 50/06 (2013.01); H02J 13/00002 (2020.01)] | 20 Claims |

|
1. A method comprising:
acquiring, by an electricity meter, first signal readings of one or more first noise signals associated with a first type of network communications between the electricity meter and one or more first devices;
acquiring, by the electricity meter, second signal readings for one or more second noise signals associated with a second type of network communications between the electricity meter and one or more second devices, the second type of network communications being different from the first type of network communications;
performing, by the electricity meter, one or more operations on the first signal readings and the second signal readings to determine whether a hot socket condition is present; and
performing, by the electricity meter, a remedial operation in response to determining that the one or more operations indicate that the hot socket condition is present.
|