| CPC G06F 9/4881 (2013.01) [G06F 8/65 (2013.01); G06F 9/4831 (2013.01); G06F 40/30 (2020.01)] | 12 Claims |

|
1. A process operating system, comprising:
a process control platform, comprising a first processor, wherein the first processor is configured to receive an operation information, extract a task from the operation information using a semantic analysis method, and publish the task;
a process operating platform, comprising a second processor, wherein the second processor is configured to receive the task and store the task in a task queue; wherein, after receiving the task, the second processor defines a processing flow based on the task, and sorts an order of the task in the task queue; and
an endpoint task robot, comprising a third processor, wherein the third processor is configured to automatically obtain the task from the process operating platform, execute the task according to the processing flow, write an execution result into a log queue, and transmit the execution result to the process control platform, wherein when current state of the endpoint task robot is idle and the second processor of the process operating platform issues an updated version, the endpoint task robot is updated according to the updated version.
|