| CPC G02B 6/4458 (2013.01) [G02B 6/4448 (2013.01); G02B 6/44515 (2023.05)] | 28 Claims |

|
1. A cable management system for a cable routed to equipment, the cable management system comprising:
first and second first cross-members each extending along a respective length between opposite first and second ends, each of the first and second cross-members defining a recessed portion at an intermediate location along the length, the recessed portion of the first cross-member being matable with the recessed portion of the second cross-member;
a bracket arrangement defining a first interface and a second interface, the first interface attaching to the first and second cross-members at the intermediate locations, the second interface being configured to receive the equipment; and
a plurality of cable support members, each cable support member being coupled to one of the first and second cross-members to move along the length, each cable support member being lockable in at least one position along the length of the respective one of the first and second cross-members, the cable support members cooperating to define a cable winding path including at least a first coil path.
|