| CPC B02C 23/12 (2013.01) [B02C 4/02 (2013.01); B02C 4/30 (2013.01); B02C 4/42 (2013.01); B02C 23/14 (2013.01); B03C 1/14 (2013.01); B03C 1/30 (2013.01); B07B 9/00 (2013.01); B03C 2201/18 (2013.01)] | 16 Claims | 

| 
               1. A magnetite iron ore processing apparatus, comprising: 
            a first high pressure grinding roller (“HPGR”) configured to operate in a crushing mode for crushing the magnetite into coarse particles; 
                a second high pressure grinding roller (“HPGR”) configured to operate in a grinding mode for grinding the coarse particles into fine particles; and 
                a dry magnetic separation (“DMS”) unit for discarding non-magnetic materials from the crushed magnetite prior to grinding, 
                wherein each of the HPGRs has a separate feedback loop associated therewith for recycling particles through the respective HPGRs, with the dry magnetic separation unit being disposed outside the two feedback loops associated with the first and second HPGRs. 
               |