| CPC H02M 3/07 (2013.01) | 20 Claims |

|
1. A method of operating a power converter, the method comprising:
charging, during a first on-time, a first output inductor by a first switching-tank circuit defining a first switch node coupled to a first lead of a resonant inductor;
creating, during the first on-time, a first current flow into the first switching-tank circuit through the resonant inductor; and then
charging, during a second on-time, a second output inductor by a second switching-tank circuit defining a second switch node coupled to a second lead of the resonant inductor, wherein the resonant inductor and capacitors of the power converter have a lower resonant frequency and a higher resonant frequency;
creating, during the second on-time, a second current flow into the second switching-tank circuit through the resonant inductor; and
repeating the charging of the first output inductor at a switching frequency, wherein the switching frequency is equal to or lower than the lower resonant frequency.
|