CPC G01N 33/383 (2013.01) | 19 Claims |
1. Concrete workability meter assembly comprising:
a testing assembly including a concrete testing instrument operatively connected to a vibrator; and
a frame assembly configured to slidingly support the testing assembly, wherein the frame assembly includes a slider plate configured to permit relative sliding between the slider plate and the vibrator.
|