CPC H04W 28/08 (2013.01) [H04W 16/02 (2013.01); H04W 72/04 (2013.01); H04W 72/542 (2023.01)] | 20 Claims |
1. A method comprising:
periodically monitoring resource utilization of a plurality of user plane functions to estimate a resource utilization level of respective user plane functions;
based on the periodically monitoring, storing a corresponding resource utilization level for the respective user plane functions; and
re-assigning a user plane traffic session from a relatively lower utilization user plane function to a relatively higher utilization user plane function based on the user plane traffic session having a resource utilization level indicator less than a first resource utilization threshold, wherein the user plane traffic session is active longer than a time duration threshold.
|