CPC E01D 22/00 (2013.01) [E01D 19/02 (2013.01); E01D 21/00 (2013.01); E01D 2101/26 (2013.01)] | 19 Claims |
1. A formwork system, comprising:
at least one horizontal formwork element configured to support a concrete structure;
a first connection beam, defining a first connection element, releasably connected to the horizontal formwork element via a first fixation element;
a second connection beam connected to the horizontal formwork element such that, upon disengagement of the first fixation element, the formwork system is configured to split in a longitudinal direction and stricken or cycled from the concrete structure in two or more discrete parts; and
a plurality of main beams configured to support the at least one horizontal formwork element, the first connection beam, and the second connection beam.
|