CPC B01J 20/3475 (2013.01) [A61L 2/18 (2013.01); A61M 1/169 (2013.01); A61M 1/1696 (2013.01); B01J 20/0211 (2013.01); B01J 20/0292 (2013.01); B01J 20/3433 (2013.01); B01J 2220/62 (2013.01)] | 16 Claims |
1. A method of recharging zirconium phosphate in a zirconium phosphate sorbent module, comprising the steps of:
flowing a brine solution through the zirconium phosphate sorbent module; and
flowing a disinfectant solution through the zirconium phosphate sorbent module after flowing the brine solution through the zirconium phosphate sorbent module.
|