CPC G06F 9/505 (2013.01) [G06Q 30/0283 (2013.01); G06Q 50/06 (2013.01)] | 30 Claims |
1. A computer-implemented method, comprising:
receiving a plurality of inputs in real-time associated with at least one of operational efficiency or profitability of a resource site;
applying a defined logic to the plurality of inputs, wherein the logic analyzes changes in the at least one of operational efficiency or profitability of the resource site in real-time based on the plurality of inputs;
dynamically determining an operational value optimization for the resource site based on the defined logic, wherein the operational value optimization comprises a profitability analysis based on a cost of power of the resource site and revenue generated from resource site compute operations;
determining whether a notice to curtail operations of the resource site is received from an external party, and upon receipt of the notice, curtailing operations of the resource site in accordance with the notice; and
prior to receiving a notice to curtail operations of the resource site from a third party, performing real-time controls of power consumption or compute load at the resource site based on the profitability analysis, wherein the real-time controls comprise at least temporarily curtailing or modifying power usage of the resource site.
|