CPC A47K 3/284 (2013.01) | 23 Claims |
1. A method of preparing and installing shower panels for a modular shower, comprising:
selecting prefabricated components including a shower base, a back shower panel, a first side shower panel, and a second side shower panel, wherein:
the shower base includes a first top edge, a second top edge, a third top edge, and a drain hole;
the back shower panel includes a left vertical edge, a right vertical edge, a top edge, and a bottom edge;
the first side shower panel includes a left vertical edge, a right vertical edge, a top edge, and a bottom edge; and
the second side shower panel includes a left vertical edge, a right vertical edge, a top edge, and a bottom edge;
measuring a first distance from the drain hole to the first top edge, measuring a second distance from the drain hole to the second top edge, and measuring a third distance from the drain hole to the third top edge;
placing a first indicator on the first side shower panel proximate to the bottom edge of the first side shower panel corresponding with the second distance;
placing a second indicator on the back shower panel proximate to the bottom edge of the back shower panel that corresponds with the first distance and the third distance;
placing a third indicator on the second side shower panel proximate to the bottom edge of the second side shower panel corresponding with the second distance;
aligning one of a plurality of contour gauge tools with the first indicator and trimming the bottom edge of the first side shower panel based on the contour gauge tool;
aligning one of the plurality of contour gauge tools with the second indicator and trimming the bottom edge of the back shower panel based on the contour gauge tool; and
aligning one of the plurality of contour gauge tools with the third indicator and trimming the bottom edge of the second side shower panel based on the contour gauge tool.
|