CPC F24D 19/1048 (2013.01) [F24D 19/1006 (2013.01); F24H 1/225 (2013.01); F24H 9/14 (2013.01); F25B 29/00 (2013.01); G05D 7/0623 (2013.01); G05D 23/1923 (2013.01)] | 20 Claims |
7. A method for controlling building equipment comprising a chiller, the method comprising:
operating the chiller to output supply water at a supply water temperature;
obtaining a measurement of the supply water temperature;
calculating an additional load factor based on the measurement of the supply water temperature and a supply water temperature setpoint;
obtaining an actual load for the chiller;
calculating an effective load based on the additional load factor and the actual load;
generating load allocations for the building equipment based on the effective load; and
controlling the building equipment in accordance with the load allocations.
|