CPC F01K 3/02 (2013.01) [B63H 11/00 (2013.01); F01K 3/08 (2013.01); F01K 3/186 (2013.01); F01K 13/02 (2013.01); F01K 15/00 (2013.01); F03G 6/071 (2021.08); F22B 29/06 (2013.01); F22B 35/10 (2013.01); F28D 20/00 (2013.01); H01M 8/04014 (2013.01); H01M 8/04029 (2013.01); H01M 8/04037 (2013.01); H01M 8/04052 (2013.01); H01M 8/04074 (2013.01); H02J 1/102 (2013.01); H02J 3/00 (2013.01); H02J 3/04 (2013.01); H02M 1/0003 (2021.05); H02M 1/007 (2021.05); B63H 11/12 (2013.01); B63H 11/14 (2013.01); B63H 11/16 (2013.01); F01K 11/02 (2013.01); F01K 19/04 (2013.01); F03D 9/18 (2016.05); F28D 2020/0004 (2013.01); Y02E 60/14 (2013.01)] | 30 Claims |
1. A thermal energy storage system, comprising:
a storage medium configured to store thermal energy obtained using input electrical energy from an energy source;
a heating element configured to thermally charge the storage medium by converting at least a portion of the input electrical energy to thermal energy;
the system being configured to provide heated air or gas from the storage medium to heat a load system; and
a control system configured to
adjust an operating parameter to thermally charge the storage medium to a supercharge temperature higher than a normal operation temperature, during a first period of abundant availability of the energy source, based on forecast information indicating an upcoming second period of reduced availability of the energy source.
|