CPC H02J 13/00028 (2020.01) [H02J 3/18 (2013.01); H02J 13/00002 (2020.01); H04L 67/125 (2013.01); H02J 2203/10 (2020.01)] | 30 Claims |
1. A method implemented by one or more processors, the method comprising:
receiving an assembled inbound complete message that characterizes a measurement from a resource of an electrical power grid and that includes a synchronized timestamp of the measurement,
wherein the assembled inbound complete message is assembled, according to a streaming data protocol, from inbound streaming data packets that are transmitted via a public communication network responsive to the measurement from the resource, and
wherein the assembled inbound complete message includes the synchronized timestamp of the measurement in response to the inbound streaming data packets each also including the synchronized timestamp;
communicating the assembled inbound complete message to a controller;
receiving, from the controller, one or more control parameters that are generated by the controller based on the assembled inbound complete message;
generating an outbound complete message that includes the one or more control parameters and that includes the synchronized timestamp of the measurement,
wherein generating the outbound complete message comprises including the synchronized timestamp of the measurement, in the outbound complete message, based on the one or more control parameters being generated based on the assembled inbound complete message; and
causing the outbound complete message to be transmitted, via the public communication network and according to the streaming protocol, as one or more outbound streaming data packets that each include the synchronized timestamp of the measurement,
wherein transmission of the one or more outbound streaming data packets causes adjustment, of the electrical resource and/or of one or more additional electrical resources of the electrical power grid, in accordance with the one or more control parameters.
|