CPC G06F 11/3055 (2013.01) [G06F 11/3072 (2013.01); G06F 11/3466 (2013.01); G06F 11/3476 (2013.01)] | 20 Claims |
1. A method for managing operation of data processing systems, the method comprising:
obtaining, using first telemetry data for a data processing system of the data processing
systems, a first inference indicating:
a health status for the data processing system, and
a confidence level for the first inference;
in a first instance of the first inference where the confidence level for the first inference falls below a threshold:
obtaining, based on content of the first telemetry data, a revised collection plan for the data processing system;
obtaining, using the revised collection plan, second telemetry data for the data processing system;
obtaining, using the second telemetry data, a second inference indicating:
a revised health status for the data processing system, and
a confidence level for the second inference;
obtaining, using the revised health status, an action plan; and
updating operation of the data processing based on the action plan to reduce a likelihood of the data processing system becoming impaired.
|