CPC B66B 19/002 (2013.01) [B66B 7/02 (2013.01); B66B 11/0045 (2013.01)] | 18 Claims |
1. A method for installing guide rails of an elevator in a hoistway, comprising the steps of:
installing one or more guide rails to form a vertical guide rail line;
positioning an elevator car at a first position in the hoistway;
placing a plurality of guide rails to stand in an upright position on the elevator car such that each of the guide rails rests on the floor structure of the elevator car;
supporting an upper half of each of the guide rails laterally on the elevator car for blocking any movement in a first lateral direction relative to the elevator car;
hoisting the elevator car in the hoistway upwards to a second position, along the guide rail line; and
installing a guide rail belonging to said plurality into the elevator hoistway on top of the guide rail line for extending the guide rail line vertically, thereby making the guide rail being installed to form the uppermost section of the guide rail line,
wherein in said placing, said plurality of guide rails are placed to stand on the sill structure such that each of said plurality of guide rails extends along an exterior surface of a side of the elevator car.
|