CPC F03D 7/06 (2013.01) [B64C 39/022 (2013.01); B64C 39/024 (2013.01); F03B 17/06 (2013.01); F03D 5/00 (2013.01); F03D 5/02 (2013.01); F03D 9/008 (2013.01); F03D 9/25 (2016.05); F03D 9/30 (2016.05); F03D 15/10 (2016.05); H02K 7/06 (2013.01); H02K 7/1853 (2013.01); B64U 2101/00 (2023.01); F05B 2220/70 (2013.01); F05B 2240/922 (2013.01); F05B 2240/923 (2013.01); F05B 2270/18 (2013.01); F05B 2270/20 (2013.01); Y02E 10/20 (2013.01); Y02E 10/70 (2013.01); Y02E 10/72 (2013.01); Y02E 10/728 (2013.01)] | 7 Claims |
1. A system for generation of energy and conversion into renewable energy comprising:
an aerial wind crane (400) having a body and a tether line (50aa) attached to the body;
an airborne wind turbine generator (500b) having an external frame connected to the aerial wind crane (400) by bridle lines (21ab, 21ac, 21aa, 21ad) gathered at joint (506) and connected to the tether (50aa), the airborne wind turbine generator including a center hub (496) connected to a plurality of girders (499) that extend radially outward and connect to the external frame (501) and also include a plurality of rotating blades (492) that extend radially outward from the center hub;
a reel system (52aa) mounted to a mooring buoy (508), the reel system connected via a tether (478) to the airborne wind turbine generator; and
a vessel (511) including a hydrogen gas generation plant (509);
wherein kinetic energy of wind current is transferred from the wind crane through the tether line (50aa) and converted to electricity by the airborne wind turbine generator and the electricity is transmitted via tether (478) to the reel system and then transferred to the vessel (511) and converted into hydrogen gas.
|