US 11,755,999 B2
Artificial intelligence based project implementation
Aditi Kulkarni, Bangalore (IN); Koushik M. Vijayaraghavan, Chennai (IN); Minal Baronia Gupta, Bangalore (IN); Ranjith Tharayil, Bangalore (IN); Sakshi A. Kapoor, Bangalore (IN); Jeffson Felix Dsouza, Pune (IN); Raghavendra Meharwade, Bangalore (IN); Ashwini C. Surve, Mumbai (IN); Anubhav F. Gupta, Meerut (IN); Rajesh Nagarajan, Chennai (IN); Khaja Kamal Avaruman Mohammed, Bangalore (IN); and Nevis Ravikumar Rodriguez, Tuticorin (IN)
Assigned to ACCENTURE GLOBAL SOLUTIONS LIMITED, Dublin (IE)
Filed by ACCENTURE GLOBAL SOLUTIONS LIMITED, Dublin (IE)
Filed on Oct. 23, 2020, as Appl. No. 17/79,089.
Claims priority of application No. 201911043328 (IN), filed on Oct. 24, 2019.
Prior Publication US 2021/0125148 A1, Apr. 29, 2021
Int. Cl. G06Q 10/10 (2023.01); G06Q 10/06 (2023.01); G06Q 10/0631 (2023.01)
CPC G06Q 10/103 (2013.01) [G06Q 10/063114 (2013.01)] 19 Claims
OG exemplary drawing
 
1. An artificial intelligence based project implementation apparatus comprising:
a readiness predictor, executed by at least one hardware processor, to
implement, for a project team, self-evaluation of viability for utilizing a project implementation framework by determining whether the project implementation framework is viable to be utilized by the project team;
a digital coach, executed by the at least one hardware processor, to
guide, based on the implementation of the self-evaluation of the viability, the project team on utilization of the project implementation framework;
a digital canvas, executed by the at least one hardware processor, to
document a discussion by the project team in a digital format during envisioning associated with the project implementation framework, and
maintain documented information for reference during execution, by the project team, of a journey associated with the project implementation framework;
a social contract analyzer, executed by the at least one hardware processor, to
evaluate, during execution of the journey, implementation of a social contract by the project team,
determine, based on the implementation of the social contract by the project team, whether the social contract is not implemented for at least one specified occurrence of a social contract requirement associated with the project implementation framework, and
identify, based on a determination that the social contract is not implemented for the at least one specified occurrence of the social contract requirement associated with the project implementation framework, at least one impediment associated with the project implementation framework; and
an impediment remediator, executed by the at least one hardware processor, to
remediate the identified at least one impediment associated with the project implementation framework by controlling, based on the identified at least one impediment, a system associated with the project implementation framework.