CPC E04H 15/18 (2013.01) [E04B 1/19 (2013.01); E04B 1/1903 (2013.01); E04B 1/35 (2013.01); E04B 7/02 (2013.01); E04B 7/06 (2013.01); E04B 7/08 (2013.01); E04B 7/105 (2013.01); E04H 15/34 (2013.01); E04H 15/36 (2013.01); E04H 15/44 (2013.01); E04H 15/50 (2013.01); E04B 2001/1927 (2013.01); E04B 2001/1957 (2013.01)] | 20 Claims |
15. A rapid-deployment hub shelter comprising:
a four-sided shelter frame including frame corners offset between each of the shelter sides,
a shoulder support in each corner and extending between each of the adjacent shelter sides,
a set of upper frame poles on each side of the four-sided shelter frame that mate directly to form a central peak along each shelter side,
a central frame assembly having extension poles that extend from the central frame assembly to each peak along each shelter side,
wherein each of the shelter sides have the same frame dimensions.
|