CPC H04L 5/001 (2013.01) [H04L 5/0053 (2013.01); H04L 27/2657 (2013.01); H04W 72/0453 (2013.01); H04W 72/12 (2013.01); H04W 72/1263 (2013.01); H04W 72/23 (2023.01); H04L 5/0098 (2013.01)] | 20 Claims |
1. A method comprising:
establishing, with a base station, a first component carrier having a first frequency band;
establishing, with the base station, a second component carrier in carrier aggregation with the first component carrier and the second component carrier having a second frequency band that overlaps the first frequency band of the first component carrier;
transmitting, from the base station, signaling and control information exclusively on the first component carrier; and
scheduling data packets on a non-overlapping portion of the second component carrier.
|