CPC G06F 9/5055 (2013.01) [G06F 9/5038 (2013.01); G06F 9/5077 (2013.01); G06F 2209/503 (2013.01); G06F 2209/506 (2013.01); G06F 2209/5011 (2013.01)] | 15 Claims |
1. A resource processing method, comprising:
obtaining a resource allocation scenario;
querying a corresponding strategy combination configuration according to the resource allocation scenario; wherein, the strategy combination configuration is configured to indicate a combination operation between at least two allocation strategies;
executing each allocation strategy to determine a target resource pool allocated with the allocation strategy;
obtaining resources corresponding to each allocation strategy from the target resource pool allocated with the allocation strategy;
executing the combination operation on the resources corresponding to the allocation strategy to obtain target resources.
|