CPC G05D 1/0088 (2013.01) [G05D 1/0225 (2013.01); G05D 1/0234 (2013.01); G06Q 10/08355 (2013.01); G05D 2201/0216 (2013.01)] | 20 Claims |
1. A system, comprising:
a vehicle scheduling unit configured to:
generate a transportation plan for a vehicle;
transmit the transportation plan to a vehicle controller of the vehicle configured to control, in accordance with the transportation plan, the vehicle to autonomously move to a position of a checkpoint at an entrance to a target highway port and from the position of the checkpoint to a specified loading/unloading position in the target highway port; and
adjust the transportation plan for the vehicle based on a transportation plan execution progress for the vehicle; and
a control unit configured to obtain the transportation plan execution progress for the vehicle executing the transportation plan and transmit the transportation plan execution progress to the vehicle scheduling unit.
|