CPC E21B 47/06 (2013.01) [G01V 9/00 (2013.01)] | 7 Claims |
1. A method for performing a static bottom hole pressure survey and caliper log in a single run, the method comprising:
providing an elongated stem portion to lower an integrated well logging system into a hydrocarbon well;
providing a multi-finger calipers portion for measuring the internal diameter of an internal wall of the hydrocarbon well, the multi-finger calipers portion comprising a plurality of measuring arms;
providing a first crossover to connect the stem portion to the multi-finger calipers portion;
providing a static bottom hole pressure (SBHP) survey portion to measure a pressure at a location within the hydrocarbon well, the SBHP survey portion comprising a plurality of memory gauges, the plurality of memory gauges directly connected to each other in series at a terminal end of the logging system;
providing a second crossover to connect the multi-finger calipers portion to the SBHP survey portion,
conducting a SBHP survey while running the integrated well logging system in hole; and
activating measuring arms of the multi-finger calipers upon reaching a target depth in the hydrocarbon well, and then pulling the integrated well logging system up the hydrocarbon well while continuously measuring, with the multi-finger calipers, a surface condition of the internal wall of the hydrocarbon well from the depth to surface.
|