US 11,706,161 B2
Building system with space use case operation
Sheri L. Meyer, Wauwatosa, WI (US); Radu M. Dorneanu, Greendale, WI (US); and Mark L. Ziolkowski, New Berlin, WI (US)
Assigned to Johnson Controls Technology Company, Auburn Hills, MI (US)
Filed by Johnson Controls Technology Company, Auburn Hills, MI (US)
Filed on May 28, 2021, as Appl. No. 17/334,258.
Application 17/334,258 is a continuation of application No. 16/261,301, filed on Jan. 29, 2019, granted, now 11,025,563.
Application 16/261,301 is a continuation in part of application No. 16/132,045, filed on Sep. 14, 2018, granted, now 10,599,115.
Application 16/132,045 is a continuation in part of application No. 15/952,173, filed on Apr. 12, 2018, granted, now 10,156,833.
Claims priority of provisional application 62/623,939, filed on Jan. 30, 2018.
Claims priority of provisional application 62/560,567, filed on Sep. 19, 2017.
Claims priority of provisional application 62/485,282, filed on Apr. 13, 2017.
Prior Publication US 2021/0288922 A1, Sep. 16, 2021
Int. Cl. H04L 67/12 (2022.01); H04L 49/35 (2022.01); G05B 19/042 (2006.01); H04L 49/25 (2022.01); G05B 15/02 (2006.01); H04L 43/0876 (2022.01); H04L 47/70 (2022.01)
CPC H04L 49/35 (2013.01) [G05B 15/02 (2013.01); G05B 19/0426 (2013.01); H04L 43/0876 (2013.01); H04L 49/25 (2013.01); H04L 67/12 (2013.01); G05B 2219/23011 (2013.01); G05B 2219/25011 (2013.01); H04L 47/70 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A building system of a building comprising one or more memory devices storing instructions thereon that, when execute by one or more processors, cause the one or more processors to:
cause one or more building devices associated with a building space of the building to operate based on a first space use case, wherein the first space use case includes one or more first operating parameters that cause the one or more building devices to control one or more conditions of the building space, wherein the one or more first operating parameters cause the one or more building devices to control the one or more conditions of the building space allowing the building space to be used by occupants for an intended purpose for which the building space was designed;
receive an indication to operate the one or more building devices based on a second space use case; and
cause the one or more building devices associated with the building space of the building to operate based on the second space use case, wherein the second space use case includes one or more second operating parameters that cause the one or more building devices to control the one or more conditions of the building space, wherein the one or more second operating parameters cause the one or more building devices to control the one or more conditions of the building space allowing the building space to be used by the occupants for a purpose other than the intended purpose for which the building space was designed.