CPC B60L 53/30 (2019.02) [B60L 50/60 (2019.02); B60L 53/20 (2019.02); B60L 53/36 (2019.02); B60L 53/50 (2019.02); B60L 53/62 (2019.02); B60L 58/12 (2019.02); B62D 53/00 (2013.01); H02J 7/00712 (2020.01); B60L 2210/30 (2013.01); H02J 2207/20 (2020.01)] | 20 Claims |
1. A mobile charging station for charging an electric construction vehicle during a transportation thereof, the mobile charging station comprising:
a transportation vehicle including a first electric power source, wherein the electric construction vehicle is adapted to be positioned on the transportation vehicle for transportation thereof; and
a power management device adapted to be positioned on the transportation vehicle, wherein the power management device is adapted to be coupled with each of the first electric power source and a battery system associated with the electric construction vehicle, and wherein the power management device is adapted to:
receive a first amount of electric power from the first electric power source;
regulate the first amount of electric power received from the first electric power source, based on a power requirement of the transportation vehicle, such that an amount of electric power stored by the first electric power source is maintained above a minimum threshold associated with operation of the transportation vehicle; and
supply a second amount of electric power to the battery system based on the power requirement of the battery system.
|