US 11,682,903 B2
Building load modification responsive to utility grid events using robotic process automation
Benson Pei Sen Hu, Markham (CA)
Assigned to Peak Power, Inc., Toronto (CA)
Filed by PEAK POWER, INC., Toronto (CA)
Filed on Nov. 2, 2022, as Appl. No. 17/979,043.
Application 17/979,043 is a continuation of application No. 17/236,582, filed on Apr. 21, 2021, granted, now 11,522,364.
Prior Publication US 2023/0046988 A1, Feb. 16, 2023
Int. Cl. H02J 3/12 (2006.01); G05B 13/04 (2006.01); H02J 13/00 (2006.01); G05B 13/02 (2006.01)
CPC H02J 3/12 (2013.01) [G05B 13/0265 (2013.01); G05B 13/042 (2013.01); G05B 13/048 (2013.01); H02J 13/00006 (2020.01)] 20 Claims
OG exemplary drawing
 
1. A system to respond to electric events, comprising:
a data processing system comprising memory and one or more processors to:
receive a site identifier for a site managed by a building management system separate from the data processing system, the site comprising a computing device used to control the building management system via a human-machine interface of the building management system;
identify a plurality of sensors installed at the site, the plurality of sensors to transmit data to the data processing system;
determine, based on a configuration of the building management system and the plurality of sensors installed at the site, a plurality of events for the site;
detect, responsive to a first event in the plurality of events, a sequence of interactions to control one or more parameters of the building management system via the human-machine interface;
configure a script based on the sequence of interactions, the script to i) establish a communication session with the computing device, ii) invoke the building management system, and iii) execute the sequence of interactions via the human-machine interface of the building management system; and
generate, based on the first event, a trigger for the script to cause execution of the script responsive to the first event.