US 11,677,576 B2
Systems and approaches for establishing relationships between building automation system components
Kushagra Thakur, Patna (IN); Harshad Damji, Bibwewadi (IN); Mehul Patel, Morris Plains, NJ (US); Hetal Shah, Acton, MA (US); Wendy Wise, Atlanta, GA (US); Benjamin Coleman, Minneapolis, MN (US); and Parker Watson, Altadena, CA (US)
Assigned to Honeywell International Inc., Charlotte, NC (US)
Filed by Honeywell International Inc., Morris Plains, NJ (US)
Filed on Mar. 6, 2020, as Appl. No. 16/812,027.
Claims priority of provisional application 62/815,195, filed on Mar. 7, 2019.
Prior Publication US 2020/0285203 A1, Sep. 10, 2020
Int. Cl. G05B 15/02 (2006.01); H04L 12/28 (2006.01); G05B 13/02 (2006.01); G05B 13/04 (2006.01); G06N 3/08 (2023.01); G06N 5/02 (2023.01); G06N 5/04 (2023.01); G06N 3/042 (2023.01)
CPC H04L 12/2803 (2013.01) [G05B 13/029 (2013.01); G05B 13/048 (2013.01); G06N 3/042 (2023.01); G06N 3/08 (2013.01); G06N 5/02 (2013.01); G06N 5/04 (2013.01); G05B 2219/163 (2013.01); G05B 2219/25011 (2013.01); G05B 2219/2642 (2013.01)] 20 Claims
OG exemplary drawing
 
1. An automated method of establishing relationships between building automation system components configured to facilitate automated control of a building, the method comprising:
receiving data for a building automation system component, the data received includes schematic data for the building automation system component and time series operational data for the building automation system component;
applying a model to the schematic data and the time series operational data received for the building automation system component to obtain results of applying the model to the data, wherein the results include a type of the building automation system component;
applying a uniform name to the building automation system component based on the type of the building automation system component and storing the uniform name in a database; and
establishing a relationship between the building automation system component and one or more other building automation system components based on the results of applying the model to the data received for the building automation system component.