US 11,655,641 B2
Construction building equipment and construction method thereof
Xiaoqing Liu, Hubei (CN); Huayong Lu, Hubei (CN); Weixiang Ding, Hubei (CN); Wei Wang, Hubei (CN); Shiqing Qian, Hubei (CN); Jin Li, Hubei (CN); Guowei Xu, Hubei (CN); Buyue Zhang, Hubei (CN); Liai Xu, Hubei (CN); Zhihua Zhang, Hubei (CN); Dong Chen, Hubei (CN); Hanwen Liu, Hubei (CN); Heng Liu, Hubei (CN); Lei Wang, Hubei (CN); Di Li, Hubei (CN); Leilei Zhu, Hubei (CN); Jun Wang, Hubei (CN); Yanhua Zhao, Hubei (CN); Huiwen Deng, Hubei (CN); Haonan Wang, Hubei (CN); Shilong Wen, Hubei (CN); and Xisheng Tian, Hubei (CN)
Filed by THE THIRD CONSTRUCTION CO., LTD OF CHINA CONSTRUCTION THIRD ENGNEERING BUREAU, Hubei (CN); CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUP CO., LTD, Hubei (CN); and CHINA STATE CONSTRUCTION ENGINEERING CORPORATION, Beijing (CN)
Filed on Sep. 29, 2020, as Appl. No. 17/35,702.
Claims priority of application No. 201911386323.8 (CN), filed on Dec. 29, 2019; and application No. 201922415418.X (CN), filed on Dec. 29, 2019.
Prior Publication US 2021/0198908 A1, Jul. 1, 2021
Int. Cl. E04G 11/28 (2006.01); E04G 3/28 (2006.01)
CPC E04G 11/28 (2013.01) [E04G 3/28 (2013.01); E04G 2003/286 (2013.01)] 5 Claims
OG exemplary drawing
 
1. A construction building equipment, comprising hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns,
wherein the multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall, the sleeve frames and the track columns are clamped on the hanging pedestals, the sleeve frames are clamped on outer sides of the track columns, the lower reversing boxes are fixed at upper ends of the sleeve frames, the hydraulic cylinders are connected to the upper reversing boxes and the lower reversing boxes, side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes, upper ends of the track columns are fixedly connected with a top platform, and hangers and formworks are suspended on the top platform through booms;
the hanging pedestals are provided with connecting bases, the top portions and the bottom portions of the sleeve frames are provided with lug plates used for cooperative fixing with the connecting bases, the lug plates are provided with short shafts, the short shafts are clamped in grooves of the connecting bases, the lug plates are rotatably disposed on the sleeve frames through rotating shafts, and the lug plates are further connected with the sleeve frames through tension springs; and
guide bases are further disposed below the connecting bases, first guide wheels and second guide wheels are disposed on the guide bases, the first guide wheels are in contact with the sleeve frames, and the second guide wheels are in contact with the track columns.