US 11,965,918 B2
Meter for use with a distributed energy resource device
Nikhil Tanwani, Delhi (IN); Bahadur Singh Rathore, Noida (IN); and Matt Karlgaard, Brainerd, MN (US)
Assigned to Landis+Gyr Technology, Inc., Alpharetta, GA (US)
Filed by Landis+Gyr Innovations, Inc., Alpharetta, GA (US)
Filed on Feb. 23, 2023, as Appl. No. 18/113,574.
Application 18/113,574 is a division of application No. 17/558,466, filed on Dec. 21, 2021.
Application 17/558,466 is a continuation of application No. 17/038,930, filed on Sep. 30, 2020, granted, now 11,237,194, issued on Feb. 1, 2022.
Claims priority of provisional application 62/914,205, filed on Oct. 11, 2019.
Prior Publication US 2023/0204639 A1, Jun. 29, 2023
Int. Cl. G01R 22/06 (2006.01); G01R 11/04 (2006.01); H01R 13/11 (2006.01); H02H 1/00 (2006.01)
CPC G01R 22/065 (2013.01) [G01R 11/04 (2013.01); G01R 22/068 (2013.01); H01R 13/113 (2013.01); H02H 1/0007 (2013.01)] 12 Claims
OG exemplary drawing
 
1. An electric meter, comprising:
a plurality of first electrical metrology components including a first line busbar, a first line current transducer positioned around the first line busbar, a first DER busbar, a first DER current transducer positioned around the first DER busbar, a first load busbar, and a first load current transducer positioned around the first load busbar; and
a plurality of second electrical metrology components including a second line busbar, a second line current transducer positioned around the second line busbar, a second DER busbar, a second DER current transducer positioned around the second DER busbar, a second load busbar, and a second load current transducer positioned around the second load busbar; and
wherein the first electrical metrology components and the second electrical metrology components are symmetrically arranged in the electric meter so that the first electrical metrology components are positioned on a first side of the electric meter and the second electrical metrology components are positioned on a second side of the electric meter that is non-overlapping with the first side of the electric meter.