CPC G06F 9/4887 (2013.01) [G06F 16/2282 (2019.01)] | 20 Claims |
1. A computer-implemented method, comprising:
determining, from a schedule, a move time and a run time associated with a job configured to move a set of data from a table of a first system to one or more tables of a second system, the move time indicating when the job is scheduled to be executed, and the run time indicating a length of time to execute the job;
calculating a job deadline corresponding to the move time plus the run time, wherein the job deadline for the job is prior to a current time;
determining that the job is delayed based on the job deadline being prior to the current time and an absence of the set of data from a status table that indicates which data has been moved from the first system to the second system;
updating a record in the status table to indicate the job is delayed based on the determination that the job is delayed;
identifying a computing process that utilizes data from the one or more tables of the second system, wherein one or more accounts are associated with the identified computing process; and
providing a notification that the job is delayed to the one or more accounts associated with the identified computing process.
|