CPC G01M 5/0033 (2013.01) [E04G 23/02 (2013.01); E04G 23/0281 (2013.01); G01M 5/0083 (2013.01); G06Q 10/20 (2013.01); G06Q 50/163 (2013.01); G06T 7/0004 (2013.01); G06T 7/70 (2017.01); G06T 17/00 (2013.01); G08B 5/22 (2013.01); G06T 2207/10032 (2013.01); G06T 2207/30108 (2013.01); H04L 67/12 (2013.01)] | 20 Claims |
1. A computer-implemented method executed by at least one processor, the method comprising:
detecting, by the at least one processor, an indication of a power loss at a building monitoring system associated with a building, the building monitoring system including a sensor network that is responsive to damage to the building;
in response to receiving the indication, automatically causing, by the at least one processor, a wireless signal to be sent to the sensor network by a device that is external to the building monitoring system;
receiving, from the device, a response to the signal from a sensor in the sensor network, the response indicating whether the building is damaged; and
selectively coordinating, by at least one processor, a repair for the building based on the response.
|