US 11,929,616 B2
Building load modification responsive to utility grid events using robotic process automation
Benson Pei Sen Hu, Markham (CA)
Assigned to Peak Power, Inc., (CA)
Filed by PEAK POWER, INC., Toronto (CA)
Filed on May 4, 2023, as Appl. No. 18/312,108.
Application 18/312,108 is a continuation of application No. 17/979,043, filed on Nov. 2, 2022, granted, now 11,682,903.
Application 17/979,043 is a continuation of application No. 17/236,582, filed on Apr. 21, 2021, granted, now 11,522,364, issued on Dec. 6, 2022.
Prior Publication US 2023/0275433 A1, Aug. 31, 2023
This patent is subject to a terminal disclaimer.
Int. Cl. H02J 3/12 (2006.01); G05B 13/02 (2006.01); G05B 13/04 (2006.01); H02J 13/00 (2006.01)
CPC H02J 3/12 (2013.01) [G05B 13/0265 (2013.01); G05B 13/042 (2013.01); G05B 13/048 (2013.01); H02J 13/00006 (2020.01)] 20 Claims
OG exemplary drawing
 
1. A system to respond to electric events, comprising:
a data processing system comprising memory and one or more processors to:
determine, based on an event, to modify an electrical load of a site;
identify, based on one or more parameters for the site, a script constructed from previously processed interactions between a human-machine interface of a building management system to adjust the one or more parameters for the site;
generate a sequence of commands defined by the script that adjust the one or more parameters for the site to modify the electrical load of the site;
transmit, via a communication session to a remote access agent executed by a computing device of the site, the sequence of commands to cause the remote access agent to execute the sequence of commands on the human-machine interface of the building management system to modify the electrical load of the site;
execute a status check script to retrieve state information from the building management system; and
confirm, based on the state information, the adjustment to the one or more parameters for the site.