CPC F16L 9/19 (2013.01) [B29C 49/0015 (2013.01); B29C 49/20 (2013.01); F16L 9/006 (2013.01); F16L 9/127 (2013.01); H01M 10/625 (2015.04); B29C 2049/2034 (2013.01); B29L 2023/22 (2013.01)] | 10 Claims |
1. A tube arrangement for the transport of tempering medium, comprising a base body made of polymeric material and produced by means of blow molding, wherein the base body has a plurality of channels, wherein a channel wall is located between the channels, the plurality of channels having a length and the channel wall extending along the length of the plurality of channels, and wherein at least one functional element which is in operative connection with the tempering medium is arranged in a channel of the plurality of channels of the base body.
|