US 11,893,519 B2
System and method for adjusting leaching operations based on leach analytic data
Dana Geislinger, Chandler, AZ (US); Travis Gaddie, Phoenix, AZ (US); Margaret Alden Tinsley, Titusville, FL (US); Muneeb Alam, Alexandria, VA (US); Steven Chad Richardson, Thatcher, AZ (US); Akaash Sanyal, Boston, MA (US); Raquel Crossman, Mesa, AZ (US); Tianfang Ni, Boston, MA (US); Cory A. Demieville, Scottsdale, AZ (US); Luke Gerdes, Framingham, MA (US); Robyn Freeman, Menlo Park, CA (US); Oleksandr Klesov, Lexington, MA (US); and Luciano Kiniti Issoe, Sao Paulo (BR)
Assigned to FREEPORT MINERALS CORPORATION, Phoenix, AZ (US)
Filed by FREEPORT MINERALS CORPORATION, Phoenix, AZ (US)
Filed on Apr. 25, 2023, as Appl. No. 18/306,534.
Application 18/306,534 is a continuation of application No. 17/985,446, filed on Nov. 11, 2022.
Application 17/985,446 is a continuation of application No. 17/850,834, filed on Jun. 27, 2022, granted, now 11,521,138, issued on Dec. 6, 2022.
Prior Publication US 2023/0419197 A1, Dec. 28, 2023
Int. Cl. G06Q 10/04 (2023.01); G06Q 50/02 (2012.01); C22B 15/00 (2006.01); C22B 3/06 (2006.01); G06Q 10/0631 (2023.01)
CPC G06Q 10/04 (2013.01) [C22B 3/06 (2013.01); C22B 15/0067 (2013.01); C22B 15/0095 (2013.01); G06Q 10/0631 (2013.01); G06Q 50/02 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A method comprising:
conducting, by a processor, leaching operations for mining production;
acquiring, by the processor, mining data from sensors that monitor the mining production;
determining, by the processor, deviations between forecast data for a mining production target during a time period and the mining data for the mining production after the time period;
determining, by the processor, a contribution to the deviations by each of a plurality of parameters, in response to changing each of the plurality of parameters from the forecast data to the mining data; and
adjusting, by the processor, the leaching operations to optimize the mining production based on the plurality of parameters.